I demolish some loose soffit panels and rotten plywood on our foundation overhang. It will need to be replaced.
![](https://www.hoodwinkedhouse.com/wp-content/uploads/2016/05/20160528_144148-scaled.jpg)
Meanwhile, 8 cubic yards of dirt are delivered. We will use this to back-fill the footprint of our deck and re-grade the yard so that rain water diverts away from the house foundation.
![](https://www.hoodwinkedhouse.com/wp-content/uploads/2016/05/20160528_121938-scaled.jpg)