Begging for a bid

I finally receive a third bid from a qualified general contractor. I was told I three written estimates were needed for me to begin my legal case. Most contractors have passed on the job, saying it was too risky to continue. They know that the more demolition is done, the more problems will be exposed. Based on what can be seen at the time, estimates range from $65K-$70K.