Trim, trim, and more trim.

I measure and cut trim for every room in the basement. I’m keeping the saw and its mess in the garage. This means I have to measure the wall, climb the stairs, put on my shoes and coat, put on my PPE, measure and cut the trim in the cold garage, dust myself off, take off my PPE, take off my coat and shoes, descend the stairs, test fit the piece, label the back side, and repeat. This process is going to take several days.

Meanwhile, Amáda has made great progress with the painting. She has finished one bedroom and moved on to the other.